The “dado” trunking has been installed in all the new and refurbished class rooms, the whole system being interlinked via cable trays installed in the duct system. The second frame is a view from the old section of the school looking down the new extension, this area being about 70% complete at this stage. The installation method being concealed HIP conduits and 6491-b LSF cables. Circuit protection via miniature circuit breakers of Bill manufacture. The main contractor for the project being Wygar Construction Co Ltd from Walsall in the West Midlands. The third frame indicates the new reception area, in this location we have the main fire alarm panel and reception area lighting controls. The second set of doors being electronically controlled to prevent unauthorized entry. Beyond the doors are located CCTV cameras to monitor the entry / exit location.